Ground up construction loans built along Liberty's growth corridor.
Ground-up construction loans fund the lot and the vertical build for spec builders and developers working the Kansas City Northland, up to 70% LTV and 85% of cost, with draws that keep pace with the job. Subdivision and industrial activity in this market concentrates along the I-35 and Route 152 corridor through Liberty, Kearney and Smithville, and a completed build's timing against Clay County's odd-year assessment cycle changes when it lands on the tax roll. We underwrite the parcel, the schedule and the exit, not a countywide average. Business-purpose only, and every structure is set in underwriting.
Typical figures, subject to underwriting and market conditions. Not a commitment to lend.
How it works
We finance both the land and the vertical construction, with a draw schedule built around your timeline. Experienced builders can access higher leverage on cost.
Where is new construction actually happening in the Liberty area?
Along the I-35 and Route 152 corridor, concentrated in Liberty, Smithville and Kearney. Subdivision and industrial activity clusters along that spine, with the Liberty Commons retail center at the southeast corner of I-35 and Route 152 anchoring the growth on the ground. Clay County's Planning and Zoning department also publishes monthly building permit activity by city, so a builder can pull the county's own count for Liberty, Kearney, Smithville and the unincorporated county rather than work from a broker's pipeline slide.
What does a Clay County city actually charge on a new build's permit?
It is valuation-based where it has been published, and Liberty has not published its own table. Gladstone, the one Clay County city with a documented fee schedule, runs from $31.00 at $1 to $500 of valuation up to $2,299.75 at $250,000 and $2,754.75 at $315,000, or roughly nine tenths of a percent of hard-cost valuation in that range. Liberty, Kearney and Smithville have not published a comparable schedule or a plan-review timeline that we could locate, so price the permit line from your own city's fee sheet before you finalize a Northland construction budget rather than assuming Gladstone's table applies countywide.
If I finish a Liberty spec build in 2026, when does it actually hit the tax roll?
At the 2027 valuation date, not the day you finish. Missouri assesses on a biennial odd-year cycle, and new construction is valued as though complete as of January 1 of the preceding odd year, which means a 2026 completion in Clay County lands on the roll at the 2027 valuation, and new construction is excluded from the levy rollback that otherwise holds county revenue roughly flat. Clay County's own calendar around that cycle: Change of Value notices go out around April 1, informal meetings with an appraiser run in April, and the Board of Equalization deadline is 5 pm on the second Monday in July, which the county states as July 13, 2026 for this cycle. Build your carry and your sale timing around that valuation date, not your certificate of occupancy date.
Does it matter which fire district a new Liberty-area build sits in?
Yes, and it is a parcel-level number, not a city-level one. Fire and ambulance districts in this market are drawn by parcel, and they stack on top of the city and school levies: Kearney Fire and Rescue #2 carries a 0.9215 levy and Northland Regional Ambulance carries 0.6548, on top of whatever the underlying city runs. On $57,000 of assessed value, the Kearney fire district levy alone adds about $525 a year (57,000 x 0.009215) that an otherwise identical parcel inside Liberty city limits does not carry. Check the parcel's district assignment before you set the pro forma's tax line, not just the mailing address.
Does flood risk factor into where I should site a new build in this market?
It can, on parcels near Smithville Lake or the Missouri River. Smithville Lake is a Corps of Engineers reservoir and the Missouri River forms the county's south and east edge, so flood zone designation matters at the parcel level near either. We could not locate a Clay County repetitive-loss or NFIP figure to quote here, so treat this as a reason to pull the parcel's flood zone before you finalize the lot, not as a countywide risk rating.
How much of a Liberty-area build do I have to fund myself?
At least 15% of cost, and often more once the value test binds. We go up to 85% of cost and up to 70% of value, whichever comes in lower. On a $1,000,000 Liberty-area build that is up to $850,000 from us and $150,000 from you (1,000,000 x 85% = 850,000). Draws follow the build schedule, so the money lands as the work does, and experienced builders can access higher leverage on cost. Price the parcel's fire district and its odd-year assessment timing into the carry before you set that number. Subject to underwriting.
FAQ
Ground-Up Construction questions, answered.
How much of my construction project will you finance?
We fund new construction up to 70% of value and up to 85% of total cost (land plus build), in most states, on loans up to $5M. Experienced builders reach the higher end of leverage. We finance both the lot and the vertical construction within those caps.
Will you finance the land or lot purchase?
Yes. Lot acquisition is funded as part of your loan-to-cost. If you already own the lot, that equity can serve as your down payment, which often lets us fund most or all of the build cost.
How does the draw schedule work?
Construction funds are released in draws as milestones are completed and verified, not handed over at closing. You submit your budget and scope of work up front, complete a phase, request a draw, and we release that portion after inspection. You pay interest on funds as they are drawn.
What are the rates and terms on a ground-up loan?
Our construction pricing starts around 10%, interest-only, on terms of 12 to 24 months. Market ground-up rates generally run 9% to 12% with 1 to 3 points. Your pricing and leverage depend on your build experience and the strength of the project.
Do you lend to first-time builders?
We consider builders at all levels, though a track record helps your leverage and rate. A first-time builder should expect to bring a strong general contractor, a detailed budget, and typically a larger equity contribution. A well-documented project goes a long way.
What do you need to quote a construction loan?
The lot cost or current value, your construction budget and scope of work, the projected after-built value, and your build experience. With those we can size the loan against both cost and completed value and send you terms.
Local rules move. Every tax rate, fee, ordinance and market figure here comes from a primary source and carries the date we read it, and we correct them as the rules change. Where a number is mid-change or we could not verify it, we say so rather than guess. Before you commit a budget, confirm anything that drives it with the city or county, and talk to your attorney or CPA on questions of law or tax.
Funding Liberty deals fast.
Get real terms, usually same day. No obligation, no hard credit pull to start.