Direct private lending in most states
Call us anytime at 512-617-9400
Apply now
Program 03

Ground-Up Construction in Bellingham

Ground-up construction loans built for Bellingham's impact-fee stack.

Our ground-up construction program funds spec builders and developers in Bellingham, financing both the lot and the vertical build up to 70% LTV and 85% of cost, with draws that track your build schedule over a 12 to 24 month term. Bellingham prices its impact fees off its own current schedules, not a citywide average, and where you build inside Whatcom County changes both the fee bill and the construction cost per unit. Washington's project permit review now runs on a statutory clock, with a fee refund if the city misses it. Business-purpose lending only, and every deal is subject to underwriting.

Ground-Up Construction in Bellingham, WA from USA Mortgage
70%
max LTV
85%
of cost
Most states
funding
$5M
max loan

Typical figures, subject to underwriting and market conditions. Not a commitment to lend.

How it works

We finance both the land and the vertical construction, with a draw schedule built around your timeline. Experienced builders can access higher leverage on cost.

Who it's for
Spec home builders
Developers and operators
Lot purchase or teardown
Build-to-rent strategies
Typical terms
Loan amountUp to $5M
LeverageUp to 70% LTV / 85% LTC
Term12 to 24 months
DrawsPer build schedule
RateFrom 10.00%*
UseSpec or build-to-rent
Apply now

*Typical terms, subject to underwriting and market conditions.

Run your Ground-Up Construction numbers.

Pressure-test the deal in seconds with our free construction loan calculator, no sign-up required.

Open the Construction Loan calculator
Local FAQ

Ground-Up Construction in Bellingham, answered.

What do Bellingham's impact fees actually add up to on a new single-family house?
$11,386.91 before permit and plan review fees, on the city's own current schedules. That is $4,133.00 for schools, $4,014.57 for parks and $3,239.34 for transportation, per unit, for a single-family or duplex lot. Projects in the Downtown or Fairhaven urban villages get a 20% discount on the transportation fee, and 15% applies in the city's other urban villages. Do not budget to the $3,487.16 transportation figure some cross-city comparisons cite. That number restates Bellingham's fee on a different standardized basis and is not what the city actually charges.
How long does the City of Bellingham have to decide on my permit, and what happens if it runs late?
65, 100 or 170 days from the completeness determination, depending on whether the project needs public notice or a hearing, and the city owes money if it misses the deadline. Under RCW 36.70B.080, effective statewide since 2025-01-01, a permit needing no public notice gets a decision within 65 days, one needing notice gets 100 days, and one needing notice plus a hearing gets 170 days. An overrun triggers an application-fee refund of 10% if it is 20% or less over the allowed period, and 20% if it exceeds that. Bellingham does not publish its own average review times, so build your carry schedule off the statutory clock, not a rumored typical timeline.
Where in Whatcom County is single-family construction actually happening right now, and what does it cost per unit?
Bellingham's own single-family permitting is falling while the county's edges are building detached homes at a higher cost per unit. The city of Bellingham permitted 231 single-family units in 2025, down from 261 in 2024, at a construction value of $268,466 per unit, while its 5-plus unit count rose from 230 to 422 over the same year: the city is densifying, not spreading. Ferndale's single-family permits ran a construction value of $407,320 per unit in 2025, the highest in the county; Blaine was estimated at $340,369 per unit and unincorporated Whatcom County at $335,168 (both Census estimates built out from partial-year reporting, not full counts). If your strategy is a detached spec build rather than infill, budget for the higher per-unit construction cost that comes with building outside Bellingham proper.
Is adding an ADU cheaper to permit in Bellingham than building a full new house?
Yes, by a wide margin on the fee schedule alone. An accessory dwelling unit pays no school impact fee, a park impact fee of $1,470.93, and a transportation impact fee capped at 50% of the principal unit's charge, $1,619.50 on a single-family lot, for a total of roughly $3,090 in impact fees against $11,386.91 for a new detached house. That is before comparing actual construction cost per square foot. For a builder deciding between adding a unit to an existing lot and a ground-up new build, the fee schedule itself is telling you which one costs less to permit.
How many units can I build on a Bellingham lot now?
At least four on most residential lots, and six on some, under a code the city adopted 2025-12-08. Bellingham updated its development regulations to comply with the state's middle-housing law (HB 1110) and ADU law (HB 1337). The statute behind it, RCW 36.70A.635, requires a city of Bellingham's size (population at least 75,000; Bellingham's OFM count is 99,030) to allow at least four units per lot on lots zoned predominantly residential, and at least six units per lot within a quarter mile of a major transit stop or where at least two of the units are affordable housing under a 50-year deed restriction. Design review, where it applies to middle housing, is limited to administrative review only. The permit record already shows the shift: Bellingham permitted 58 duplex units and 26 units in three- and four-unit buildings in 2025, up from 34 and 10 in 2024 and from 4 and 0 in 2023. Read the city's adopted ordinance before you underwrite a specific lot; the exact units-per-lot outcome for that parcel depends on its zoning and transit proximity.
How much of a Bellingham ground-up build do I have to fund myself?
About 15% of total cost. We lend up to 85% of cost and up to 70% of value, whichever binds first, to a ceiling of $5,000,000. On a $700,000 Bellingham project cost that is $595,000 from us and $105,000 from you (700,000 x 85% = 595,000). Budget the fee stack inside that cost, not beside it: impact fees run $11,386.91 per single-family unit before permit and plan review. Draws follow the build schedule over a 12 to 24 month term. Subject to underwriting.
Do you check credit on a Bellingham construction loan?
We run it, and there is no minimum score on this program. Construction is asset-based, so the lot, the budget, the schedule and the finished value carry the file, and credit carries far less weight than it would at a bank. A weaker file is usually offset with lower leverage rather than a decline. No hard pull to start, and no W-2s or pay stubs. Subject to underwriting.
Do I need a building track record to borrow on a Bellingham spec build?
No, but it moves your leverage. Experienced builders can access higher leverage inside the same up to 70% LTV and 85% LTC ceiling, and a first project gets a harder look at the budget and the schedule. Build that schedule off the statutory permit clock, 65, 100 or 170 days from the completeness determination, rather than an assumed local timeline. Subject to underwriting.

More Ground-Up Construction questions, answered on the program page

Resources

Guides for Ground-Up Construction

Browse all guides
More in Bellingham

Other programs in Bellingham

All Bellingham loan programs
About the local figures on this page

Local rules move. Every tax rate, fee, ordinance and market figure here comes from a primary source and carries the date we read it, and we correct them as the rules change. Where a number is mid-change or we could not verify it, we say so rather than guess. Before you commit a budget, confirm anything that drives it with the city or county, and talk to your attorney or CPA on questions of law or tax.

Published by USA Mortgage Funding, LLC, NMLS #152588. Researched from primary sources by our team, drafted with AI assistance, and every figure checked against its source before publishing. Where an answer rests on a public record, that record is linked under it. Figures read on 2026-08-22.

Funding Bellingham deals fast.

Get real terms, usually same day. No obligation, no hard credit pull to start.

Apply nowTalk to us