Direct private lending in most states
Call us anytime at 512-617-9400
Apply now
Program 03

Ground-Up Construction in Denton

Denton ground up construction loans, from raw lot forward.

Built for spec home builders and developers. We fund the land and the vertical build up to 70% LTV and 85% of cost, with draws that keep pace with the job. Denton's water and wastewater impact fees step on plat date, so the plat year sets your per-door cost. Business-purpose only, and every structure is set in underwriting.

Ground-Up Construction in Denton, TX from USA Mortgage
70%
max LTV
85%
of cost
Most states
funding
$5M
max loan

Typical figures, subject to underwriting and market conditions. Not a commitment to lend.

How it works

We finance both the land and the vertical construction, with a draw schedule built around your timeline. Experienced builders can access higher leverage on cost.

Who it's for
Spec home builders
Developers and operators
Lot purchase or teardown
Build-to-rent strategies
Typical terms
Loan amountUp to $5M
LeverageUp to 70% LTV / 85% LTC
Term12 to 24 months
DrawsPer build schedule
RateFrom 10.00%*
UseSpec or build-to-rent
Apply now

*Typical terms, subject to underwriting and market conditions.

Run your Ground-Up Construction numbers.

Pressure-test the deal in seconds with our free construction loan calculator, no sign-up required.

Open the Construction Loan calculator
Local FAQ

Ground-Up Construction in Denton, answered.

What does the plat date actually change on my impact fee bill?
It sets which fee tier your lot falls into, not the build date. Under the City of Denton's fee schedule and Ordinance 25-1143 (effective 2025-09-02), a standard single-family meter platted between January 29, 2019 and May 31, 2026 pays combined water and wastewater impact fees of roughly $8,300 to $12,400, depending on zone. A lot platted on or after June 1, 2026 pays roughly $10,100 to $22,500, with water running $1,365 to $9,104 by zone and wastewater $8,711 to $13,437 by drainage basin. Legacy plats from before 2003 pay as little as $2,527 combined. Pull the plat date before you underwrite the deal: two otherwise identical lots a few months apart on plat filing can carry a five-figure swing in impact fees alone.

Sources: cityofdenton.com

What are the base building permit fees inside the City of Denton?
$0.89 per square foot plus a flat $141 plan review fee for a new one- or two-family dwelling. On a 2,000 square foot house that's about $1,780 in permit fees plus the $141 review fee, before the water and wastewater impact fees above and before roadway impact and park development fees, which also apply and which we have not quoted here. New residential permits are applied for and tracked through the city's eTRAKiT portal, and plans have to show compliance with the Denton Development Code. The city does not publish a formal review-timeline commitment; a commercial permit expediter reports typical initial review of 10 to 15 days and 5 days on resubmittal, but that is a secondary source, not a city guarantee, so budget your draw schedule around your actual submittal, not a target.

Sources: cityofdenton.com

If my lot is on the US-380 corridor but outside city limits, who permits the build?
Denton County's own development services, not a city. A meaningful share of the new supply along the 380 corridor, where Aubrey, Providence Village and the unincorporated subdivisions around them are absorbing the fastest county growth, sits in FWSD or PID land outside any city's jurisdiction. That means construction there routes through the county rather than through Denton's building department, and the city's plat-date impact fee tiers above don't apply the same way. Confirm jurisdiction on your specific parcel before you assume city fees, city timelines, or city inspection cadence.

Sources: dentoncounty.gov

Does the special-district tax stack change how I should size a build-to-rent exit here?
Yes, and it's the piece that doesn't show up in the impact fee line. Paloma Creek alone sits inside five separate Denton County Fresh Water Supply Districts, each with its own ad valorem taxing authority funding water, sewer, drainage, roads and even emergency services on top of the county, city and school district rates. That stack is a carry cost that lands on whoever holds the finished house, whether that's you as a rental or a buyer at resale, and it belongs in your exit underwriting the same way the impact fees belong in your cost basis. Confirm the specific district's rate for your parcel before you close; this is not something a lender can price for you generically.

Sources: 8a.palomacreek.org

If I plan to hold a finished spec build as a short-term rental, what does Denton's registration process cost me on the front end?
A $100 annual registration and a parcel-specific eligibility check, not a given. City of Denton short-term rental rules, tightened effective January 1, 2025, cap residential-zoning registrations citywide at 1,000, allow a maximum of 2 certificates per parcel, and require a 100-foot separation between STRs in residential districts. None of that is guaranteed to transfer with a newly built or newly sold property, and the city's own information packet does not address certificate transferability, so treat it as unconfirmed rather than assumed. Before you underwrite nightly-rental income on a spec build, confirm the zoning district, whether the citywide cap has room, and whether a competing STR already sits within 100 feet.

Sources: cityofdenton.com

Do the water and wastewater impact fees sit inside the cost you lend against?
They do, which is why the split matters: we fund up to 85% of total cost, so you fund at least 15% of it. We fund up to 85% of cost and up to 70% LTV, whichever binds first, with draws released against the build schedule. On a $700,000 all-in Denton cost that is up to $595,000 from us and $105,000 from you (700,000 x 85% = 595,000). Impact fees sit inside that cost basis, and on a lot platted on or after June 1, 2026 the water and wastewater fees alone run roughly $10,100 to $22,500 per door. Subject to underwriting.

Sources: cityofdenton.com

Denton publishes no permit review timeline. Can a first-time builder still work around that?
Experience changes the leverage here, not the answer. Experienced builders can access higher leverage; a first project is more likely to sit lower inside the 70% LTV and 85% of cost range. Bring a real budget, a real schedule and a builder you can name. Denton publishes no review-timeline commitment on permits, so a first-timer should hold slack inside the 12 to 24 month term rather than assume a clean run. Subject to underwriting.

Sources: cityofdenton.com

Does the loan ceiling change if my lot sits outside city limits on the 380 corridor?
No. It runs up to $5,000,000 whether the lot sits inside the city or out on the US-380 corridor under county jurisdiction. That covers a single spec house and it covers a small build-to-rent group, whether the lot sits inside the city or out on the US-380 corridor under county jurisdiction. Leverage binds more often than the ceiling does: up to 70% LTV and 85% of cost, drawn per the build schedule across a 12 to 24 month term. Send the lot, the plat date and the budget. Subject to underwriting.

Sources: dentoncounty.gov

More Ground-Up Construction questions, answered on the program page

Resources

Guides for Ground-Up Construction

Browse all guides
More in Denton

Other programs in Denton

All Denton loan programs
About the local figures on this page

Local rules move. Every tax rate, fee, ordinance and market figure here comes from a primary source and carries the date we read it, and we correct them as the rules change. Where a number is mid-change or we could not verify it, we say so rather than guess. Before you commit a budget, confirm anything that drives it with the city or county, and talk to your attorney or CPA on questions of law or tax.

Published by USA Mortgage Funding, LLC, NMLS #152588. Researched from primary sources by our team, drafted with AI assistance, and every figure checked against its source before publishing. Where an answer rests on a public record, that record is linked under it. Figures read on 2026-08-12.

Funding Denton deals fast.

Get real terms, usually same day. No obligation, no hard credit pull to start.

Apply nowTalk to us