Direct private lending in most states
Call us anytime at 512-617-9400
Apply now
Program 03

Ground-Up Construction in Missouri

Ground-up construction loans for builders across Missouri.

We finance both the land and the vertical build, up to 70% LTV and 85% of cost, on 12 to 24 month terms with draws released against your schedule. Missouri assesses your finished building the same way regardless of how many units you put on the lot, and reassessment lands on a fixed odd-year calendar you can plan a build around. Business-purpose lending only, and every structure is set in underwriting.

Ground-Up Construction in Missouri from USA Mortgage
70%
max LTV
85%
of cost
Most states
funding
$5M
max loan

Typical figures, subject to underwriting and market conditions. Not a commitment to lend.

How it works

We finance both the land and the vertical construction, with a draw schedule built around your timeline. Experienced builders can access higher leverage on cost.

Who it's for
Spec home builders
Developers and operators
Lot purchase or teardown
Build-to-rent strategies
Typical terms
Loan amountUp to $5M
LeverageUp to 70% LTV / 85% LTC
Term12 to 24 months
DrawsPer build schedule
RateFrom 10.00%*
UseSpec or build-to-rent
Apply now

*Typical terms, subject to underwriting and market conditions.

Run your Ground-Up Construction numbers.

Pressure-test the deal in seconds with our free construction loan calculator, no sign-up required.

Open the Construction Loan calculator
Local FAQ

Ground-Up Construction in Missouri, answered.

How does Missouri tax my lot while it sits vacant before I break ground?
Not automatically as a homesite. RSMo 137.016.5 classifies vacant land by its immediate most suitable economic use, weighed across eight factors including prior use, location, zoning, legal restrictions, utilities, size and access. A raw lot you have not touched yet is not presumed residential just because a house is coming. Budget the carry on whatever classification the assessor assigns today, not the classification your finished build will earn.
When does my completed Missouri build actually land on the tax roll?
On a fixed, statewide calendar, not the day you get your certificate of occupancy. Missouri reassesses biennially in odd-numbered years under RSMo 137.115, and new construction is valued as though it had been completed as of January 1 of the preceding odd-numbered year. A build finished in 2026 is picked up at the 2027 valuation date. That gap is a real, plannable window for carry-cost modeling, and it applies the same way whether you are building to sell or building to hold with a DSCR rental loan behind it.
Can a big jump in assessed value after my build trigger extra scrutiny?
Yes, and the rule cuts in your favor if the assessor skips a step. Before Missouri raises a subclass 1 parcel's assessed value by more than 15 percent since the last assessment, excluding new construction itself, RSMo 137.115.10 requires a physical inspection, with written notice of the owner's rights and at least 30 days to request an interior look. A drive-by does not count. The State Tax Commission has held these steps mandatory, not discretionary, and where the assessor skips them the property owner prevails as a matter of law. Keep the notice paperwork on any Missouri build that moves value sharply.
If I build a small multifamily property in Missouri, does it get taxed as commercial?
No. RSMo 137.115.5 puts residential property, subclass (1), at a 19 percent assessment ratio with no unit-count cutoff, so a duplex, a fourplex or a small walk-up you build to hold all land in the same subclass as a single-family house, well short of the 32 percent ratio subclass (3) carries. That gap is worth building into the pro forma on any build-to-rent portfolio before you finalize unit count.
What insurance exposure should I plan for during a Missouri build?
Builder's risk is standard, and Missouri's distinctive tail is seismic, not wind. The state's Department of Commerce and Insurance reports New Madrid-area earthquake take-up at 10.4 percent in 2024, down from 18.3 percent in 2015, with fewer than 20 percent of residences covered in 101 of the state's 115 counties. A standard landlord or builder's risk policy does not include earthquake coverage by default. Quote the specific site and ask about it directly, especially in southeast Missouri.
Does Missouri set a statewide permit or impact fee schedule for new construction?
We did not locate one, and we are not going to state a number we have not verified. The state-law research behind this page found no statewide permit or impact fee schedule to quote, which is not the same as proving none exists. Get the current fee schedule from the city or county where you are building before you finalize a construction budget.
FAQ

Ground-Up Construction questions, answered.

How much of my construction project will you finance?
We fund new construction up to 70% of value and up to 85% of total cost (land plus build), in most states, on loans up to $5M. Experienced builders reach the higher end of leverage. We finance both the lot and the vertical construction within those caps.
Will you finance the land or lot purchase?
Yes. Lot acquisition is funded as part of your loan-to-cost. If you already own the lot, that equity can serve as your down payment, which often lets us fund most or all of the build cost.
How does the draw schedule work?
Construction funds are released in draws as milestones are completed and verified, not handed over at closing. You submit your budget and scope of work up front, complete a phase, request a draw, and we release that portion after inspection. You pay interest on funds as they are drawn.
What are the rates and terms on a ground-up loan?
Our construction pricing starts around 10%, interest-only, on terms of 12 to 24 months. Market ground-up rates generally run 9% to 12% with 1 to 3 points. Your pricing and leverage depend on your build experience and the strength of the project.
Do you lend to first-time builders?
We consider builders at all levels, though a track record helps your leverage and rate. A first-time builder should expect to bring a strong general contractor, a detailed budget, and typically a larger equity contribution. A well-documented project goes a long way.
What do you need to quote a construction loan?
The lot cost or current value, your construction budget and scope of work, the projected after-built value, and your build experience. With those we can size the loan against both cost and completed value and send you terms.
See all frequently asked questions
Resources

Guides for Ground-Up Construction

Browse all guides
More in Missouri

Other programs in Missouri

All Missouri loan programs
About the local figures on this page

Local rules move. Every tax rate, fee, ordinance and market figure here comes from a primary source and carries the date we read it, and we correct them as the rules change. Where a number is mid-change or we could not verify it, we say so rather than guess. Before you commit a budget, confirm anything that drives it with the city or county, and talk to your attorney or CPA on questions of law or tax.

Funding Missouri deals fast.

Get real terms, usually same day. No obligation, no hard credit pull to start.

Apply nowTalk to us